KGM Vietnam continues to update the construction log for the Green Villa project, where the floor concrete pouring is being implemented according to correct technical procedures, ensuring safety and structural quality for the entire project.
At this stage, structural construction plays a particularly crucial role, directly affecting the long-term stability and load-bearing capacity of the project. KGM Vietnam organizes construction with strict control, from site preparation, rebar arrangement, and formwork installation, to the pouring and finishing of the floor concrete.
The entire rebar system is thoroughly inspected for type, spacing, elevation, and connections, ensuring strict adherence to the approved design documents. Before concrete pouring, the construction surface is meticulously cleaned, its elevation controlled, and all critical points are fully reinforced to minimize errors during the construction process.
The concrete pouring process is carried out synchronously and continuously, utilizing specialized equipment and skilled workers. Vibration compaction is performed correctly to ensure the concrete achieves optimal density, minimizes voids and honeycombing, and guarantees load-bearing capacity according to technical standards. Simultaneously, occupational safety is always prioritized, with full protective equipment provided, clear demarcation of construction areas, and continuous supervision throughout the implementation process.
Guided by the construction motto "correct technique - correct procedure - correct schedule," KGM Vietnam not only focuses on completing the work item but also emphasizes the long-term quality of the project's structure. Each stage is meticulously documented, inspected, and accepted before moving on to the next phase.
The floor concrete pouring at Green Villa is a crucial foundation, contributing to the overall stability and sustainability of the project and creating a favorable premise for subsequent finishing construction steps.
KGM Vietnam is committed to continuously providing transparent updates on construction progress, while maintaining the highest technical standards in each work item, to deliver projects that are high-quality, safe, and sustainable over time.