Wall maintenance after completion is an extremely important step, directly affecting the quality, durability, and long-term aesthetic appeal of the project. This is a decisive stage that helps ensure the wall structure remains solid, minimizing deterioration or damage during use. KGM VIETNAM always emphasizes post-construction maintenance, recognizing that without proper procedures, the project's quality can rapidly decline, leading to aesthetic degradation and affecting the lifespan of the building structure. Neglecting or underestimating this step can lead to cracked, peeling, or weakened walls, diminishing the overall value of the project over time.
One of the most crucial elements in maintenance is watering to keep the walls moist. This is a fundamental step that helps the cement mortar bonding process occur more effectively, ensuring the walls achieve optimal strength and durability. Water plays a vital role in supporting the hydration reaction of cement, helping the material reach maximum strength, increasing load-bearing capacity, and preventing cracking due to rapid drying.
Watering should be carried out regularly and continuously, especially during the first few days after construction. This is when the cement mortar is still fresh, requiring appropriate moisture to ensure bonding quality. The watering maintenance period typically lasts from 7 to 14 days, depending on the type of mortar used, as well as weather conditions and the surrounding environment. If temperatures are high and air humidity is low, walls tend to dry faster, thus requiring increased watering to ensure necessary moisture. Conversely, in humid weather conditions, watering can be adjusted to avoid excessive moisture.
In addition to maintaining wall moisture, installing wall mesh before plastering is also an effective measure to reinforce the structure and prevent wall cracking. Wall mesh helps distribute force evenly across the surface, preventing uneven expansion and contraction of the plaster layer, thereby minimizing the likelihood of cracks. This method is commonly applied in projects with high requirements for quality and long-term durability. Selecting the appropriate type of mesh is also crucial; it must ensure good adhesion and high durability to maximize effectiveness during the maintenance process.
Overall, post-construction masonry wall maintenance not only enhances the quality and durability of the project but also ensures aesthetic appeal and minimizes potential future damage issues. This is one of the key factors determining the long-term value of the project.