At the Maison Décor construction site, the KGM Vietnam team is focused on completing the basement wall section – one of the most critical stages to ensure the stability and safety of the entire project. Rebar tying, formwork erection, and structural component inspection are meticulously carried out in strict accordance with technical standards and design specifications.
Every construction step is rigorously supervised to ensure structural accuracy, the robustness of the steel system, and overall integrity before proceeding to the concrete pouring stage. The technical and construction teams always coordinate seamlessly and work meticulously to maintain the highest quality and ensure the project schedule.
KGM Vietnam – A professional general contractor for high-quality and valuable projects.